<ul id="csawk"></ul>
<tr id="csawk"><td id="csawk"></td></tr>
  • <ul id="csawk"></ul>
    <ul id="csawk"><pre id="csawk"></pre></ul>
  • <strike id="csawk"><menu id="csawk"></menu></strike>
  • Products

    Contact Us

    Hubei Rigel Industrial Co.,Ltd
    Add: Dushan Road, EZhou Economic Development Zone, Hubei, China
    Tel: +86-711-5907446Tel: +86-711-5907446
    candyluo: +86-13720214854
    E-mail: rigelcandy@163.com
    Url: https://www.rigelpanel.en.alibaba.com/
    WeChat : candyluo8888 or 0086 13720214854

    Installation Process

    Home > Products > Installation Process
    • Setting the line and carrying the board in positionEject double lines of board thickness up and down the axes of installed wall board, easily carry the panel to the side of wall according to the required specification.
    • Sawing boardUsing hand-hold electric saw to saw freely according to the specification of wall.
    • SizingSpread polymer mortar on one tenon side casually.
    • InstallationCarrying the panel to the installation place, correcting the wall board by gavelock and making it tightly close, and let the polymer mortar squeeze out into full and fixing it with a chock temporarily.
    • Correcting、FixingUsing a guiding rule of two meters or longer to check verticality and leveling correction, then using 6mm or 8mm reinforcing steel bar and using the construction sealant to fix.
    • Grouting and filling starchFilling and strickling the corrected wall panel with polymer mortar, filling the big gap with pea gravel concrete.
    • Stick anticrack tapeClean dirt of each cement gap and stick anticrack tape.
    • Installing electrical wires and switchesSetting lines on the places needing to be set with concealed wire and switch box, then cut a groove by hand-hold electric saw,filling with polymer mortar after installation。
    • Installing doorcasePreparing a door and window hole on the installed wall, anchoring by the splint or lines.
    • Facing coating and wall papersScraping putty powder directly without plastering on the installed wall,then brushing coating and sticking wall paper.
    • Facing cermic tile,decorative sheetSticking ceramic tiles or other wood facing panels casually without plastering on installed wall.
    • Eelectric apparatus installationInstall lights,furniture,air-conditioners casually on installed room, nailed or hanged.

    Hot News

    久久99热国产这有精品| 热RE99久久精品国产66热| 国产成人精品久久免费动漫| 国产精品久久久久久久福利院| 久久精品国产亚洲麻豆| 亚洲a∨无码精品色午夜| 中文精品99久久国产| 亚洲日韩国产精品乱-久| 精品露脸国产偷人在视频 | 国产精品无圣光一区二区| 8090成人午夜精品| 99爱在线精品视频免费观看9| 国产成人福利精品视频| 99ee6热久久免费精品6| 午夜精品久久影院蜜桃| 久久久久se色偷偷亚洲精品av| 国产精品自产拍高潮在线观看| 97久久久精品综合88久久| 日韩精品人妻系列无码专区| 亚洲精品无码日韩国产不卡?V| 国产成人精品久久一区二区三区| 无码精品A∨在线观看| 国产91在线精品| 中文字幕一区日韩精品| 久久国产精品麻豆映画| 国产精品久久久久久久午夜片| 国产精品三级在线观看| 国内精品福利在线视频| 久久99久久99精品免视看动漫| 久九九久福利精品视频视频| 亚洲性日韩精品一区二区三区| 国产精品亚洲а∨天堂2021| 国产精品白丝喷水在线观看者相| 亚洲欧洲精品成人久久曰| 国产精品久久久久久久人人看| 97久久精品人妻人人搡人人玩 | 麻豆精品无码国产在线果冻| 99精品人妻无码专区在线视频区| 国产精品91在线| 99re热免费精品视频观看| 亚洲欧美国产精品专区久久|